HEB Hangar at San Antonio International Airport (SAIA)

Owner:H. E. Butt Grocery Company, Headquartered, San Antonio, TexasReturn to previous page
Owner:H. E. Butt Grocery Company, Headquartered, San Antonio, Texas

San Antonio International Airport (SAIA) is situated on more than 2600 acres of land and ranked as one of the top 50 largest airports in the United States, serving over 8 million passengers annually. CDS Muery was selected to provide engineering and surveying services for development of a company corporate aircraft hangar for one of the largest independently owned food retailers with more than 340 stores and over 76,000 employees. The new hangar is located within a stretch of existing corporate hangar facilities at SAIA. The project included a new 28,000 SF office/hangar building, a 30,500 SF concrete apron with a taxiway drive extension for runway access, a fueling facility with containment, access drive to adjacent arterial roadway, and parking for 60 spaces to accommodate owner, guests, and operations staff.

CDS Muery provided engineering and surveying services that included setting survey controls, topographic and tree surveys, survey of existing horizontal and vertical improvements, design of concrete and asphalt pavement sections required for various aircraft and vehicle loads, subdivision platting, parking and service vehicle/aircraft access circulation design, drainage analysis and storm water runoff system design, traffic impact analysis, domestic water and fire protection water main, sanitary sewer collection system, finish grade design, and FAA design standards apron/taxilane striping and marking. CDS Muery prepared construction document plans, engineers opinion of probable cost estimate, and specifications that were prepared in accordance with FAA and City of San Antonio Aviation Department standards. Additional regulatory compliance and agency coordination included City of San Antonio Aviation Department, TCEQ SWPPP, SAWS, TDLR, and CPS. CDS Muery provided services during construction phase that included construction site visits, RFI coordination, Contractor/Owner site meetings, monthly reports, and final inspections. 

Click Images to Enlarge.

Surveying services provided

  • Boundary Surveys
  • Construction Phase Surveying
  • Control Surveys
  • Design Surveys

Engineering services provided

  • Construction Phase Services
  • Runway, Taxiway, & Apron Design
  • Site Development Engineering
  • Water and Wastewater Design

Markets Served

  • Aviation