Projects

 

Arden Grove Professional Offices

The Class A level professional office building is situated on a postage stamp size parcel, and located in a downtown infill redevelopment area. The site planning and design is governed by new urbanism zoning (Form-Based) and a river overlay district which presented a unique challenge...
learn more

Byron P. Steele High School

This new high school campus encompassed 98 acres consisting of over 300,000 sq. ft. of educational building structures and multiple athletic facilities for various sports activities. The major Class 4A school was a needed expansion to the SCUCISD...
learn more

Central Watershed Sewer Relief Main

CDS Muery was selected by SAWS to improve the level of service and efficiency of the Central Watershed Sewer Relief Main outfall system infrastructure to increase flow capacity and upgrade long term reliability to meet operational service expectancy...
learn more

Clear Crossing Substation

The overall project limits encompassed 285 acres for a laydown yard parcel and a 345 kV electric transmission substation parcel that were constructed in two separate phases. The laydown yard pad area and substation pad area are approximately 55 acres and 40 acres, respectively...
learn more

Evans Road LWC Replacement & Road Reconstruction

Replacement of an existing flood hazard/low water crossing located approximately in the middle of the project segment with a 350 LF five-lane, pre-stressed concrete I-beam bridge crossing that provides unflooded access. Reconstruction and expansion of the roadway from two-lane to four-lane with a center turn lane to meet current standards...
learn more

HEB Hangar at San Antonio International Airport (SAIA)

Located within a stretch of existing corporate hangar facilities at SAIA, the project included a new 28,000 SF office/hangar building, a 30,500 SF concrete apron with a taxiway drive extension for runway access, a fueling facility with containment, access drive to adjacent arterial roadway, and parking for 60 spaces...
learn more

Houston Street Reconstruction

The City 2007 Bond CIP project required the street and drainage reconstruction of approximately 3850 LF of Houston Street, a Secondary Arterial Thoroughfare in a Commercial/Industrial business district...
learn more

Lackland AFB Dormitory Expansion

The LAFB Dormitory Expansion was a turnkey project with a design-build team of a contractor, architect/MEP, and CDS Muery as civil engineer. The project was a redevelopment...
learn more

Nissan Dealership

The Owner of the commercial property wanted a reconstruction and renovation of the existing automobile sales and service site that would create a better customer experience and more efficient maintenance service facility for the Nissan dealership...
learn more

Northwest Vista College

The Northwest Vista College campus spreads across 137 acres and has a population of over 16,000 students. CDS Muery has served as engineer and surveyor for various site development expansion phases over the past six years...
learn more

Oaks Medical Offices at Westover Hills

The Oaks medical office designed by LKdg Architects is a 45,000 SF Class B, 3-story office building located on approximately 4 acres. The existing property characteristics consist of a heavily vegetated site with City ordinance protected trees...
learn more

Ravenfield Road & Bridge Expansion

This project required the replacement of a 2000 LF segment of existing 2-lanes on Ravenfield Road which crossed the major watershed of Medio Creek, and included replacement of the 3-48” existing culvert pipes under the road that were inadequate to mitigate recurring flood conditions...
learn more

Riley Substation

The overall project property encompasses a 100 acre parcel that included a laydown yard parcel and a 345 kV electric transmission substation parcel. The initial phase of laydown yard pad area and substation pad area within the 100 acres are approximately 6 acres and 21 acres, respectively...
learn more

Six Mile Creek Sanitary Sewer Replacement

This project included the design and construction of a new 84” diameter outfall main and 72” siphon facility extending from the Rilling Road Waste Water Treatment Plant headworks north to 98th Street just north of Stinson Airport in southeast San Antonio. Planning and mapping services included aerial photography, topography, ownership research, easement surveying, utility investigation.
learn more

Tesla to Riley Power Transmission Line (CREZ)

CDS Muery provided the full extent of surveying services required for the design and construction of the 66 mile power transmission line and layout of the corridor route. The services provided include acquisition research, transmission alignment determination...
learn more

Twin 72 Sewer Main Replacement

This project included the upgrade of the twin 72-inch outfall mains extending from 97th Street just north of Stinson Airport northwest approximately 2.6 miles to Hart Ave. The project consisted of providing plans, specifications, and construction phase services for the rehabilitation/replacement of approximately 13,500 linear feet of twin 72-inch sanitary sewer mains.
learn more

Western Watershed Relief Line

This project included surveying and design for a sanitary sewer relief line to serve the Culebra Creek watershed upstream of Leon Creek. Also included were outfall sewers connecting four area lift stations, the Taft High School WRC, and the Culebra Creek WRC to the new relief main.
learn more

Wood Street Lift Station

This project included the design and construction of a new 9.5 MGD Lift Station with a new 20" force main initiating adjacent to the existing lift station at Wood Street and discharging into the Uvalde Waste Water Treatment Plant, approx. 8,800 LF.
learn more